ボイラー焼却炉不定形耐火物施工 最終日

ボイラー焼却炉不定形耐火物施工の最終日の施工です

Boiler Incinerator Unshaped Refractory Construction at the last day

施工工程①

Work process①

前日に施工を行った型枠のバラシ作業

Breaking up the formwork that was installed on the previous day.

施工工程② Work process②

炉内上部に不定形耐火物の施工

Installation of monolithic refractories on the upper part of the furnace.

最後に炉内の清掃等を行い作業完了になります

Finally, the inside of the furnace is cleaned to complete the work.

最初の状態と比較をすると耐火性、耐久性ともにしっかり施工ができと思います

I think that the construction has been done well, both in fire resistance and durability, compared to the initial state.

最低でも一年に一度は炉内の点検を行い

The furnace should be inspected at least once a year.

少しの劣化を修理する事で状態よく保てます

It is possible to keep the furnace in good condition.